Drazice OKC 100 NTR Operation And Installation Manual - Page 6

Browse online or download pdf Operation And Installation Manual for Boiler Drazice OKC 100 NTR. Drazice OKC 100 NTR 18 pages. Tank-type water heaters for vertical mounting
Also for Drazice OKC 100 NTR: Operation And Installation Manual (17 pages), Operation And Installation Manual (12 pages), Operation And Installation Manual (20 pages), Operation And Installation Manual (20 pages), Operation And Installation Manual (18 pages), Operating And Installation Manual (20 pages)

Drazice OKC 100 NTR Operation And Installation Manual
Technical description: OKC 80, OKC 100, OKC 125, OKC 160, OKC 180, OKC 200, OKC 100/1m
2
2
125/1m
, OKC 160/1m
, OKC 180/1m
OKC 80
TYPE
A
736
B*
731
C
615
D
524
E
501
F
-
G
G3/4"
H
-
I
211
J
-
*Distance from the upper heater's edge to the end of the water inlet and outlet tubes. Check the B and N dimensions before
drilling.
The values behind the slash apply to heaters with a 1 m2 exchanger.
Table 2
2
2
, OKC 200/1m
Upper
160,180,200L
4 anchor bolts
Dimensions 450mm and E
Double check before drilling
Figure 1
OKC 100
OKC 125
2
OKC 100/1m
OKC 125/1m
881
1046
876
1041
765 / 636
765/801
524
524
651 / 701
651 / 701
- / 551
- / 551
G3/4" / G1"
G3/4" / G1"
- / G3/4"
- / G3/4"
211
211 / 261
-
-
and
lower
suspension
OKC 160
2
2
OKC 160/1m
OKC 180/1m
1235
1230
1005
524
651 / 701
- / 831
G3/4" / G1"
- / G3/4"
211 / 261
720 / 815
2
Upper
suspension
and support
80-125L
2 anchor bolts
OKC 180
OKC 200
2
OKC 200/1m
1187
1287
1182
1282
793
793
584
584
685
685
- / 895
- / 895
G3/4" / G1"
G3/4" / G1"
- / G3/4"
- / G3/4"
245
245
600
600
- 6 -
, OKC
2