Drazice OKC 200 NTRR / BP Operation And Installation Manual - Page 13

Browse online or download pdf Operation And Installation Manual for Boiler Drazice OKC 200 NTRR / BP. Drazice OKC 200 NTRR / BP 17 pages. Stationary water heaters
Also for Drazice OKC 200 NTRR / BP: Operation And Installation Manual (12 pages), Operation And Installation Manual (19 pages), Operation And Installation Manual (20 pages), Operation And Installation Manual (20 pages), Operation And Installation Manual (18 pages), Operating And Installation Manual (20 pages), Operation And Installation Manual (18 pages), Operating And Installation Manual (13 pages)

Drazice OKC 200 NTRR / BP Operation And Installation Manual
Fig. 1
Connection of the heater exchanger (left, right) and fittings at the cold water inlet
Connection to the cold water inlet
must conform to ČSN 060830.
0 - Air outlet valve
U – Shut-off valve
P1 - Safety valve with backflow flap
P2 - Safety valve for heating circuit
M - Manometer
Z – Test valve
V - Drain valve
Fig. 2
Fitting of hinges and thermometer
onto the heater
13