Drazice OKC 250 NTRR/SOL Operation And Installation Manual - Page 8

Browse online or download pdf Operation And Installation Manual for Boiler Drazice OKC 250 NTRR/SOL. Drazice OKC 250 NTRR/SOL 12 pages. For solar systems
Also for Drazice OKC 250 NTRR/SOL: Operating And Installation Manual (17 pages)

Drazice OKC 250 NTRR/SOL Operation And Installation Manual
drain of heater, the HSW inlet has to be provided with a "T" fixture with a drain valve. Each individually lockable
heater must be at the cold water inlet provided with a stop gate, test cock, safety valve with a reverse flap and a
pressure gauge.
Example of connecting a heater with solar collectors and a gas boiler
Connecting a heater to a boiler heating circuit:
The heater is placed on the ground, next to the heating source, or in its vicinity. The heating circuit is
connected to marked inputs and outputs of the heater exchanger; the deaerating valve is mounted in the
highest place. It is necessary to install a filter into the circuit in order to protect the pumps, the three-way
valve, and backflow flaps, and the exchanger from sedimentation. It is recommended to flush the heating
circuit before the assembly. All wiring connections must be properly insulated from heat.
If the system works with priority heating of HSW using a three-way valve, always follow the installation
instructions of the three-way valve's manufacturer.
8