Bosch 1617EVSPK Operating/Safety Instructions Manual - Page 20
Browse online or download pdf Operating/Safety Instructions Manual for Power Tool Bosch 1617EVSPK. Bosch 1617EVSPK 24 pages. Router tools
Also for Bosch 1617EVSPK: User Manual (34 pages)
BM 2610018532 01-12:BM 2610018532 01-12.qxp 1/23/12 9:21 AM Page 20
INSTALLING TEMPLET GUIDE ADAPTER
(Not included, available as accessory)
Place templet guide adapter over the holes in
the center of the sub-base, and align the two
threaded holes in the bottom of adapter with
the countersunk holes in sub-base. Fasten
adapter with the screws provided. Note that
the adapter is reversible, so the release lever
may be positioned as desired. (Fig. 25)
CENTERING THE SUB-BASE OR
TEMPLET GUIDES
Your router features the Bosch "Precision
Centering Design". Its sub-base is precisely
centered at the factory. This positions the bit at
the center of the sub-base and optional
templet guides.
Precision centering allows you to use the edge
of the subbase or templet guides to closely
follow jigs such as straight guides, templets,
and dovetail fixtures without worrying about bit
walk-off from the intended cut line for any
reason, including the orientation of the router's
handles relative to the jig.
To quickly re-center the sub-base, attach the
sub-base using the set of flathead screws
(included) and the countersunk screw holes in
the sub-base. (Flathead screws have the
CENTERING CONE
(optional accessory)
FIG. 26
PLUNGE BASE
CENTERING SHAFT
(optional accessory)
TEMPLET GUIDE
(optional accessory)
B
CENTERING SHAFT
(optional accessory)
D
A
C
B
A
C
D
D
tapered heads.) The flathead screws and
countersunk holes will pull the sub-base into a
position that is very close to centered.
To most precisely re-center the sub-base or
templet guides, attach the sub-base using the
optional Bosch RA1151 Centering Device.
Follow steps 1-8 (Fig. 26 & 27).
1. If a templet guide is to be centered, Install
the templet guide adapter and template
guide (optional attachments) as described
elsewhere in this manual.
2. Position the sub-base so that its pan-head
screw holes are over the matching set of
threaded holes in the base.
3. Insert the pan-head screws through the sub-
base and tighten them until they are snug,
but still allow the sub-base to move.
FIG. 27
OTHER BASES
A = M4 COUNTERSUNK SCREW
HOLES
B = M4 PAN-HEAD SCREW HOLES
C = TEMPLET GUIDE ADAPTER
SUB-BASE
A
D = HOLES FOR ATTACHING
B
-20-
FIG. 25
TEMPLET GUIDE
ADAPTER
(optional accessory)
MOUNTING SCREWS
CENTERING SHAFT
(optional accessory)
SCREW HOLES
ROUTER TO ROUTER TABLE
MOUNTING PLATE
(Under sub-base on
non-plunge bases)