Ancona Capri Series Owner's Manual - Page 4

Browse online or download pdf Owner's Manual for Plumbing Product Ancona Capri Series. Ancona Capri Series 9 pages.

TOPMOUNT INSTALLATION

Please carefully read complete instructions before beginning installation.
Note: These instructions are for installation with solid surface, composite material countertops.
Ancona recommends professional countertop installers, customer is responsible for damage to
the countertop or sink during installation.
1. Unpack the new sink and check the contents of the materials supplied: Sink, Mounting brackets, and
cut-out template (depending on model).
2. Preparing the countertop:
A. Place the template (B) on the countertop. Ensure the template (B) is centered on the counter so that it
is parallel to the counter edge and that the installation hole
will not interfere with the structure of the cabinet
B. Tape the template (B) to the countertop to keep it in place
and trace the outline on the template (B) with a pencil.
3. Cutting the installation hole:
Dill a pilot hole and cut the countertop opening. Use the appropriate cutting tool for the surface you are
cutting.
4. Preparing the sink
A. Place the sink (A) into the installation hole to verify the fit. Adjust the cut-out if necessary.
B. Place the sink (A) upside down and align the bottom edge with waterproofing strip.