Carmanah G Series Install Manual - Page 13

Browse online or download pdf Install Manual for Construction Equipment Carmanah G Series. Carmanah G Series 18 pages. Rrfb mast arm kit
Also for Carmanah G Series: Quick Start Manual (16 pages), Manual (11 pages), Energy Management System Replacement Manual (12 pages), Cabinet Door Replacement Manual (10 pages), Manual (9 pages), User Manual (18 pages), Install Manual (14 pages), Manual (10 pages), Manual (10 pages)

Carmanah G Series Install Manual
3. Feed the light bar cable through the rubber grommet on the light bar chassis and secure the chassis to
the light bar mounting bracket with the fasteners supplied with the light bar. See appendix for additional
hardware details.
Ensure to leave enough cable length on the back side of the steel tubing to form a drip loop (see
step 11 – this section).
4. Cut light bar cable to length.
Ensure to leave enough cable length to form a strain relief loop on the inside of the light bar
chassis (see step 5 – this section).
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
RRFB MAST ARM INSTALL GUIDE
|
carmanah.com
13