ATI Technologies 39-0050 Installation & Operation Manual - Page 12
Browse online or download pdf Installation & Operation Manual for Measuring Instruments ATI Technologies 39-0050. ATI Technologies 39-0050 19 pages. Digital control installation & operation
ATL Feeder Connections using ATL Control Only Power Supply with Global Timing Pulse.
Control Supply Transformer:
0-12: 0-12: 25VA
230v AC Primary
DANGER: Mains Voltage
T5AMP FUSE
DIGITAL CONTROL
INSTALLATION
& OPERATION: 10
Disconnect mains supply before removing cover.
Do not drill fixing or cable
entry holes in the top or
sides of the casing.
Use the recommended
cable cross sectional area
(csa/mm) and where
possible the specified
colours.
Replace fuses with the
specified values AFTER the
cause of a blown fuse is
traced and corrected.
Earth to
chassis
230v AC Mains IN for
Control Supply
Transformer.
Chassis is earthed via
fixing screw.
Must be supplied from a
2-pole switched outlet.