4. Drive the control valve to low fire and check for a stable low fire flame.
5. Cycle the temperature control valve to high fire and verify that the pressure drop is
consistent with the previous setting. Re-adjust if necessary.
6. As the incinerator comes up to temperature, backpressures and combustion air
temperatures will change. Make final burner adjustments after the incinerator has
reached its normal operating temperature.

10. Burner Maintenance

Preventive maintenance is the key to a reliable, safe and efficient combustion system. The
core of any preventive maintenance system is a list of periodic check list. These are
guidelines only. The customer should make the final determination on maintenance
intervals and tasks to be performed while considering the working environment.
System regular safety audit must be taken out, including gas leakage check no longer than
every half a year. If necessary, the frequency of audit should be increased. Leak detection,
and control functions of the equipment must be included in the scope of the audit. Only
Anderson technicians or those who are trained and qualified by Anderson, as well as other
relevant professionals, can maintain the burners. All valves, especially ball valves, must be
slowly open or close when switching in order to prevent pressure shock in pipe.

10.1 Half a year checklist

Inspect the flame sensing devices for good condition and cleanliness.
– Check for proper air and gas pressures.
– Test all the system alarms for proper response signals.
– Check and clean igniter electrodes.
– Check actuators and control valves for free, smooth action and adjustment.
– Check for the proper operation of ventilating equipment.
– Test the interlock sequence on all safety equipment. Manually force each interlock
to intentionally fail while at the same time noting if related equipment closes or
stops as specified by the manufacturer. Test the flame safeguard by manually
shutting off the gas to the burner.
– Test the manual gas shut off cocks for proper operation.

10.2 Yearly checklist

– Leak test the safety shut-off valves and pipe for tightness of closure to make sure
no leakage.
– Test the pressure switch settings by checking the switch movements against
pressure settings and comparing these with the actual impulse pressure.
– Visually check igniter cable and connectors.
– Be sure the burner bodies and air wings, the ignite and the flame sensors are not
damaged or distorted.