Comnet CLFE IPS Series Installation And Operation Manual - Page 14

Browse online or download pdf Installation And Operation Manual for Switch Comnet CLFE IPS Series. Comnet CLFE IPS Series 19 pages. High-power poe mid-span injector

Comnet CLFE IPS Series Installation And Operation Manual
INSTALLATION AND OPERATION MANUAL
Overload Counter
Shows how many times the port has been in overload status.
Short Counter
Shows how many times the port has been shorted.
Power Denied
Counter
Shows how many times the port has denied power to loads.
Invalid Detection
Counter
Shows how many times the port has been detected an invalid load.
Commands
Disable
Disables the port. Buttons "Disable", "Enable" & "Force Power" are mutually exclusive.
Enable
Enables the port. Buttons "Disable", "Enable" & "Force Power" are mutually exclusive.
Force Power
Forces the port to turn on power. This will bypass detection, classification and power
management checks. No violation will be honored. Buttons "Disable", "Enable" & "Force
Power" are mutually exclusive.
Reset Statistics
Resets all port statistics.
Apply
Applies the user selected configuration on to the selected port.
Tech SupporT: 1.888.678.9427
CLFE(X)IPS
INS_CLFE(X)IPS_REV–
12/15/11
PAGE 14