Electrolux C260R Operating And Installation Manual - Page 15

Browse online or download pdf Operating And Installation Manual for Ventilation Hood Electrolux C260R. Electrolux C260R 20 pages. Hydro-extractor
Also for Electrolux C260R: Operating Manual (24 pages), Service Manual (41 pages)

Electrolux C260R Operating And Installation Manual

Electrical installation.

Electrical Installation is to be carried out by an
authorized electrician.
Switch
Fit a current switch prior to the extractor.
The cable between switch and hydro-extractor
must comply with at least HO5VV-F in
accordance with CEE(13)53 and must hang in a
loop.
Fuse
Fit a current switch prior to the extractor.
Connect the extractor to a separate fuse board.
The motor is fitted with a thermal fuse, which is
why separate motor protection is unnecessary.
Warning
The hydro-extractor must not be connected to a
central timer which disconnects the power
supply at a certain time. The lid cannot be
opened If the current is disconnected while an
extraction cycle is in progress. This means that
there is a risk of the lid being opened by force.
38 litres
50Hz
Voltage
Fuse, slow
Cable
60 Hz
Voltage
Fuse, slow
Cable
58 and 88 litres
50 Hz
Voltage
Fuse, slow
Cable
60 Hz
Voltage
Fuse, slow
Cable
487 22 52 21 - Cent. 240, 260, 290, GB
Installation
200 V 3 AC
230 V 3 AC
10A
10A
2
4 x 1.5 mm
4 x 1.5 mm
115 V 3 AC
200 V 3 AC
16A
10A
2
4 x 2.5 mm
4 x 1.5 mm
200 V 3 AC
230 V 3 AC
16A
16A
2
4 x 2.5 mm
4 x 2.5 mm
115 V 3 AC
200 V 3 AC
25A
16A
2
4 x 6.0 mm
4 x 2.5 mm
400 V 3 AC
415 V 3 AC
10A
2
2
4 x 1.5 mm
4 x 1.5 mm
208-240 V 3 AC
380 V 3 AC
10A
2
2
4 x 1.5 mm
4 x 1.5 mm
400 V 3 AC
415 V 3 AC
10A
2
2
4 x 1.5 mm
4 x 1.5 mm
208-240 V 3 AC
380 V 3 AC
16A
2
2
4 x 2.5 mm
4 x 1.5 mm
10A
2
440 V 3 AC
10A
10A
2
4 x 1.5 mm
10A
2
440 V 3 AC
10A
10A
2
4 x 1.5 mm
15
1968
2
2