Daikin 2MXL18QMVJU Installation Manual - Page 11

Browse online or download pdf Installation Manual for Heat Pump Daikin 2MXL18QMVJU. Daikin 2MXL18QMVJU 20 pages.
Also for Daikin 2MXL18QMVJU: Installation Manual (20 pages)

Daikin 2MXL18QMVJU Installation Manual
5.

Refilling refrigerant

Check the type of refrigerant to be used on the machine nameplate.
Precautions when adding R410A
Fill from the liquid pipe in liquid form.
R410A is a mixed refrigerant, so adding it in gas form may cause the refrigerant composition to change, preventing normal
operation.
1) Before filling, check whether the cylinder has a siphon attached or not. (It should have something like "liquid filling siphon
attached" displayed on it.)
Filling a cylinder with an attached siphon
Stand the cylinder upright when filling.
There is a siphon pipe inside, so the
cylinder need not be upside-down to
fill with liquid.
• Be sure to use the R410A tools to ensure pressure and to prevent foreign objects entering.
6.

Charging with refrigerant

• If the total length of piping for all rooms exceeds the figure listed below, additionally charge with 0.21oz/ft (20g/m) of
refrigerant (R410A) for each additional piping length.
Outdoor unit capacity class
Total length of piping for all rooms
• If additional refrigerant has been charged list the amount added on the nameplate on the reverse side of the service lid.
CAUTION
Even though the stop valve is fully closed, the refrigerant may slowly leak out; do not leave the flare nut removed for a long
period of time.
English
Filling other cylinders
Turn the cylinder upside-down
when filling.
2MXS18∗, 2MXL18∗
3MXS24∗, 4MXS36∗, 3MXL24∗
98-3/8ft (30m)
131-5/8ft (40m)
10