Atlantic PV23EXT Product Manual - Page 5
Browse online or download pdf Product Manual for Lawn and Garden Equipment Atlantic PV23EXT. Atlantic PV23EXT 12 pages.
Excavating and Setting the PV1700 (Pond-free System)
Once you have determined the proper size basin for your project, begin by deciding the
placement of the vault. The vault should be placed away from the
waterfall where the lid can be accessed easily.
Level and tamp the bottom of the excavation, then install underlayment and EPDM liner.
Another layer of underlayment may be added on top of the liner for greater security before
setting the Eco-Blox and Pump Vault. Backfill the space between the Eco-Blox and the
excavation to lock them into place, either outside the liner with sand or clean fill, or inside
the liner with gravel ¾" or larger in diameter. Top the liner and basin with ¾" or larger gravel
or decorative stone. Smaller, more decorative gravel, landscape glass, etc. can be used to
cover the top of the basin, provided a denser mesh is installed beneath the material.
Plumbing the PV1700 (Pond-free System)
The PV1700 has pump discharge step fittings
molded into each side of the enclosure. The
step fittings are labeled for 1½" or 2" PVC pipe
and have cut lines molded in for each size.
This allows the installer the flexibility to exit
out the left or right side. Use a hand saw to
remove the appropriate step fitting,
using the cut lines as a reference. The flat
panel on the back is for an overflow. The
two drill points near the top of the left
and right sides are for the installation
of an AF1000 Auto Fill (See Auto Fill
instructions on pg. 10).
Excavating and Setting the PV1700 (Eco-Rise System)
The capacity of the basin will vary depending on the size, height and number of the
decorative fountain elements. For a general rule of thumb, make the basin at least twice the
width of the fountain piece(s) at the widest point. To capture the splash from taller pieces or
more aggressive flows, where added storage capacity isn't desired or needed, excavate a
shallow 2-3" deep bowl around the basin and extend the liner out to at least twice the
height of the decorative elements in all directions. This technique will recapture as much
water as possible with minimum additional excavation.
Once you have determined the approximate size of the basin, lay out the Eco-Blox and
PV1700. The PV1700 should be placed away from the fountain piece where the lid can be
accessed easily. Place the flat panel of the PV1700 up against the Eco-Blox so water can
enter through the ports. Tailor the excavation to the shape of the Eco-Blox and PV1700 so
the vertical walls of the basin will support the outside walls of the Eco-Blox, leaving a few
extra inches all of the way around to make installation easier.
The PV1700 flat panel will sit flush
against the Eco-Blox, so that water
can enter the pump vault. The area
where the pump vault will sit should
be dug 22" deep for the PV1700.
When using Eco-Blox, the pump vault
will recess lower than the Eco-Blox.
The area for the Eco-Blox to sit should
be dug 18" deep.
OVERFLOW
PUMP
DISCHARGE
STEP FITTING
AF1000
AUTO FILL
OVERFLOW
5