Atlantic Ultraviolet BIO 1.5 Installation Operation & Maintenance - Page 7

Browse online or download pdf Installation Operation & Maintenance for Water Filtration Systems Atlantic Ultraviolet BIO 1.5. Atlantic Ultraviolet BIO 1.5 16 pages. Ultraviolet water purifiers

I
: BIO-1.5
NSTALLATION
.10-0514A 230
USING BALLAST NO
SAFETY EQUIPMENT REQUIRED TO PERFORM TASK
1.
Remove water purifier from shipping carton. Inspect water purifier, power cord and plug for damage. Do not operate if there
is any damage to the purifier, power cord or plug. All models, of the Bio-Logic
lamps packed separately. Keep the lamp aside for installation once the purifier has been properly installed.
2.
Units occasionally experience damage in shipment due to the fragility of the quartz sleeve. It is therefore recommended to
inspect the water purifier for damage to the quartz sleeve after it has been removed from the shipping carton. Each end of the
unit as well as the inlet and outlet should be viewed to see if the quartz sleeve has experienced damage. If the quartz sleeve
shows signs of damage it should be replaced before the purifier is pressurized. See "Quartz Sleeve Installation, Cleaning
or Replacement" in the "Maintenance" section for the proper method of replacing the quartz sleeve in your water purifier.
3.
The water purifier should be mounted horizontally on a flat dry surface. The purifier should not be solely supported by its
plumbing connections. Secure the water purifier using the mounting clips.
4.
The water purifier MUST be connected to the cold water line only. Inlet water temperature should not exceed 100
5.
It is recommended that a 5-micron sediment filter be installed, in line, prior to the water purifier. The sediment filter will
stop or trap any particulates from entering the water purifier. Particulates may cause damage to the quartz sleeve, as well as
interfere with the purifier's ability to disinfect the water. The sediment filter may also help to reduce the amount of routine
cleanings of the quartz sleeve.
6.
Shut off valves should be installed on both the inlet and outlet sides of the water purifier. The use of bypass valves is not
recommended. The shut off valves allow the purifier to be isolated from the water supply, which is required when removing
the quartz sleeve.
7.
Unions should be installed on both the inlet and outlet of the water purifier; this will allow easy removal of the water purifier
from the plumbing, if required. Apply Teflon
8.
When all plumbing connections are complete, allow water to enter the water purifier at a low flow rate, until the purifier is
full. NOTE: Close the purifier outlet valve to pressurize the chamber. With the purifier pressurized, it should be checked
for leaks. Once it is determined that there are no leaks, the inlet valve can be fully opened.
9. Unpack the lamp and ballast. While holding lamp end, carefully push lamp socket on. Carefully slide lamp straight into the
quartz sleeve, without angling. Push the end cap on, over the static gland nut. Attach the ground connector to the grounding
tab of the chamber with included hardware (see photo on page 8).
WARNING: To insure proper operation and safety of the purifier, your unit must be connected
to a known good ground.
CAUTION: Lamp and quartz sleeve are easily damaged. Exercise care when handling.
BIO-3.0
AND
USING BALLAST NO
50/60H
V
®
tape to threads of inlet and outlet ports to ensure a tight seal.
Figure 3 - 120v and 230v 50/60Hz (ballast no. 10-0518A and 10-514A)
.10-0518A 120
Z
®
line of water purifiers, are shipped with the
50/60H
V
Z AND
o
F.
7