Atlas Copco TEX270PS Overhaul Instructions - Page 13

Browse online or download pdf Overhaul Instructions for Power Tool Atlas Copco TEX270PS. Atlas Copco TEX270PS 20 pages. Handheld pneumatic breakers
Also for Atlas Copco TEX270PS: Safety And Operating Instructions Manual (20 pages)

Atlas Copco TEX270PS Overhaul Instructions
TEX 140PS 150PE 180PS 190PE 220PS 230PE 270PS 280PE

Tool chuck

30
tons
A
The lock wire (A) will be sheared off in two halves.
Clear the inside of the cylinder from the remaining
half of the lock wire.
© 2007 Atlas Copco Construction Tools AB
1
2
|
No. 9800 0800 01

Assembly

Before re-assembly do the following:
Properly clean all parts of the machine.
Oil all parts of the machine.
Replace all O-rings.
Replace all worn or damaged parts.
Tool chuck
Rotation of tool chuck
ISO
point to flat
|
2007-10-01
Overhaul instructions
US
flat to flat
13