Becom BE-ART-50 Installation & Operation Manual - Page 5
Browse online or download pdf Installation & Operation Manual for Kitchen Appliances Becom BE-ART-50. Becom BE-ART-50 11 pages. Twin arm kneading machine
When the faulty parts are checked, if it is found that the breakage cannot be traced back to the company but to
scarce maintenance or incorrect use by the client, a regular sales invoice will be issued for the returned parts.
The guarantee will not be applied if the client delays payment.
The guarantee does not cover any faults and/or damage caused during transport, and/or by incorrect
installation, negligence or incorrect machinery use, and/or if the parts have been tampered with, repaired or
modified without obtaining the written authorization of the manufacturer and, in any case, for causes not
related to same.
3. Installation
3.1 Lifting the machine
The machine can be sent packed on a pallet and wrapped in carton. The machine, if packed in this manner, can
be lifted using a forklift truck or a transpallet; thread the forks into the relative spaces below the packaging
itself. The machine can also be lifted using a crane, by passing the cables or strips under the packaging. In this
case respect the maximum tension angle of the cables, which must be 45°.
NOTE: The machine can only be lifted by qualified experts.
3.2 Reception
Remove the packaging and make sure no damage has been done. Free the machine from the blocks on the base.
If you find any damage, immediately inform the carrier.
3.3 Electrical connection
Make sure the mains have the same voltage as that indicated on the machine data plate. The power supply must
be connected using a disconnecting switch with a capacity that is suitable fore the machine power
requirements, with a three-phase (3 phases + earth) or single-phase plug. Connect to the power panel plants.
Before powering the machine, make sure the contacts were not loosened during transport. The connections
must be made in compliance with local laws in force.
3.4 Starting for the first time
Check the general conditions of the machine. Our technical assistance office must be informed immediately of
any faults or breakages caused during transport. When the machine has been prepared, make sure its voltage
corresponds with that of the supply network. When connected correctly, make sure the motor rotates in the
correct direction. If it does not, invert the polarities.
BEWARE: Any fault caused to the machine because of incorrect movements or tampering caused during the
period covered by the guarantee can compromise guarantee validity.
© BEcom Sales (2020-02)
BE-ART
Page 4