DrumCraft Series 4 Assembly Instructions - Page 3

Browse online or download pdf Assembly Instructions for Drums DrumCraft Series 4. DrumCraft Series 4 4 pages.

Claw
Bearing
Edge
Bass
Drum
Mount
Fold the Spur forward
Tom
Holder
Bass Drum
Mount
Knurled
Nut
Bottom
Section
1. Place the bass drum (T) on the floor, so the bearing edge points
towards the top.
Hoop
2. Place the white BD head (B) on the bearing edge, and center the logo
Head
so you can read it.
3. Center one of the BD hoops (D) onto the aluminium ring of the head.
4. Slide the one nylon washer (H) on each BD tension rod (E).
Spur
5. Slide the tension rod including washer into the BD claw hooks (F).
6. Position every tension rod, washer claw hook unit onto the hoop and
screw the tension rod into the receiver nut of the lugs. Tighten the
tension rod by hand only. Tuning will be done later.
7. Turn the shell upside down.
Lug
8. Repeat step 1– 6 on the batter side of the drum with the clear head.
9. Set the shell right side up.
10. Loosen the spur's wing nut and angle the spur forward to the deter­
mined slots and fix it again.
11. Extend the spur by loosen the square head screw with the drum key.
Fix the legs so the front end of the BD is lifted about 3 cm (two fingers
wide) off the ground.
Tom
12. Insert the single post (O) into the bass drum mount of the bass drum.
Bracket
13. Insert the tom holders (P) into the matching holes of the single post.
14. Loosen the wing screw of the tom bracket of the rack tom (Q, R) to
slide onto the tube of the tom holder. The nose of the memory lock
Single
should snap in the notch of the bracket.
Post
15. Tighten the wing screw of the bracket.
16. Set the angle and height of the toms that an imagined line of the batter
head points towards your hip.
Hoop
Head
17. Separate the hoops from the floor tom (S) by loosening the two tension
rods.
Lug
18. Place one head on the bearing edge of the tom. Center the hoop on the
head and slide the tension rods with washers through the holes of the
hoop into the receiver nuts of the lugs and tighten them.
FT Bracket
19. Repeat this step for the opposite side.
20. Position the floor tom legs in the brackets and tighten the wing screws.
FT Leg
21. Set the height of the tom as an imagined line from the batter head
points towards your hip.
22. Spread the legs on the bottom section of the Snare Stand (J) and
tighten the wing screw. Slide the tube of the top section into the base
section and tighten the wing screw on the tube joint.
Basket
23. Tip the basket of the stand to an upright position and spread it open
by hand, if it doesn't open as wide as you need for the snare, use the
knurled nut to fine adjust the width.
24. Place the Snare onto the basket and tighten the knob so the three arms
embrace the snare drum with no tension.
bd A
ssembly
bd s
etuP
r
t
Ack
oms
f
t
A
loor
om
ssembly
s
nArestAnd