3M Dynapro ET 3250 Installation Manual - Page 2
Browse online or download pdf Installation Manual for Monitor 3M Dynapro ET 3250. 3M Dynapro ET 3250 4 pages. Brightness-enhanced display option and moisture deflector option
Also for 3M Dynapro ET 3250: Installation Manual (4 pages)
Installing the NEMA 4X Panel Gasket
Make the cutout and drill the holes.
3.
Bring the power cable and the data cable
4.
connections up to the cutout.
Place the bezel-mounted sealing gasket
5.
(supplied) against the chassis of the ET unit so
that the gasket seals the gap between the panel
and the unit.
Depending on connector depth and cabinet
space, you may have to make your connections at
this point, before installing the unit in the cutout.
If so, skip to steps 10 and 11, then come back to
step 6.
Place the ET unit in the cutout. You may need
6.
assistance at this point to hold the unit in place.
Attach the unit to the panel from the back using
7.
the #10-32 screws that are supplied. Choose the
1/2" or 3/4" screws supplied, whichever is best
for the thickness of your panel.
Put a lock washer on each screw and then put a
flat washer on each screw (on top of the lock
washer).
11723 (Rev. 1.2)
3M Dynapro ET 350/355 Monitors and ET 3250/3255 Computers
Gently tighten each screw until some resistance
8.
is encountered.
With a torque screwdriver, tighten the screws,
9.
still in a circular sequence, to a torque of 12 inch-
pounds. This will take several passes, since each
pass reduces the previous torque setting.
Connect cables.
10.
Connect the unit to power.
11.
Page 2