DAIREN SSW 24-4ND Operation Manual - Page 9
Browse online or download pdf Operation Manual for UPS DAIREN SSW 24-4ND. DAIREN SSW 24-4ND 11 pages. 24v ups
9) Simulation of mains failure
Simulation of mains failure by Switch off input MCB
1、The inverter Red LED
indicator will lights up at
the same time, the mains
Green LED indicator goes
off.
4、When the batteries
discharged to its critical low
voltage level, the Electronic
Low-Voltage .
Cut Off Circuit will activate.
5、Switch on the AC supply
to the UPS to resume its
normal operation.
Revision: 01
Operation Manual of 24V UPS
Date: Dec.5. 2021
2、The DC Ammeter will
reflect the battery output
discharge current.
3、If required to test the
UPS for longer duration,
the AC supply to the UPS is
advisable to be switched
off.