ATTEMA FTTX Instruction Manual - Page 6
Browse online or download pdf Instruction Manual for Power distribution unit ATTEMA FTTX. ATTEMA FTTX 6 pages. Distribution closure
!! Pay attention !! that the feeder cable must always turn clockwise!
Feeder cable inserted into ports 1 or 4 by the civilian team: cable then automatically turns
clockwise.
Feeder cable inserted into ports 2 or 3 by the civilian team: cable must be crossed once
diagonally at the bottom of the closure so that the feeder cable still turns clockwise in the
closure.
.
1
2
Instruction manual Civil V1.0 _ XX-09-2020 _ FttX-Distribution Closure AT29030 _ Page 6 of 6
3
4. Fit the gas block connector.
Fit the sealing cap to the end of the empty
duct.
Wrap
the overlength of the minicable up in
The housing.
!! Make sure
while storing it back in the closure !!
The over length of the mini feeder cable is to
4
be specified by the contractor.
5. Take the lid.
Check the foam strip for damage and brush
away any soil.
Brush the top edge of the housing to remove
any soil.
Place the lid on the housing.
6. Slide the attachment clips over the edge of
the lid.
the cable does not bend