AirTrack Factory AirBeam User Manual - Page 10
Browse online or download pdf User Manual for Accessories AirTrack Factory AirBeam. AirTrack Factory AirBeam 12 pages.
Also for AirTrack Factory AirBeam: User Manual (7 pages)
HELP!
Does your equipment seem to be leaking?
Make sure all valves are closed properly. The pin inside the grey valve are often left open (pin in)
when the cap is closed, which means the valve will still be leaking air. Always make sure the valve is
closed (pin out) before closing the valve. Still leaking? Check our FAQ.
Can't fit the equipment in the bag?
When rolling up the AirBeam, make sure that the center line is facing down!
We recommend using the blower to get the last bits of air out of the equipment. Our blowers have
an input and an output vent. One for inflating and one for deflating. For deflating, connect the
blowers' adapter to the input (IN) side of the blower and deflate untill the equipment is completely
flat.
When I detach the blower from the equipment all the air goes out.
Make sure the pin inside the valve is closed (pin out) before attaching the blower. The pin should
remain closed (pin out) during inflation and usage. Only open the valve (pin in) when adjusting
pressure or deflating.
10
S P O R T S