3onedata IES7116G-8GS Series Quick Installation Manual

Browse online or download pdf Quick Installation Manual for Switch 3onedata IES7116G-8GS Series. 3onedata IES7116G-8GS Series 3 pages. Managed industrial ethernet switch

3onedata IES7116G-8GS Series Quick Installation Manual
IES7116G-8GS Series
Managed Industrial Ethernet Switch
Quick Installation Guide
3onedata Co., Ltd.
Address:
3/B, Zone 1, Baiwangxin High Technology
Industrial
Park,
Xili,
Shenzhen
Website:
www.3onedata.com
Tel:
+86 0755-26702688
Fax:
+86 0755-26703485
【Package Checklist】
Please check whether the package and accessories are intact
while using the switch for the first time.
1. Industrial Ethernet switch 2. Quick installation guide
3. CD
4. Certification
5. Warranty card
6. DIN-Rail mounting attachment
If any of these items are damaged or lost, please contact our
company or dealers, we will solve it ASAP.
【Product Overview】
The product is full Gigabit managed DIN-Rail industrial
Ethernet switch. Module as follow: IES7116G-8GS (8
1000Base-SFP interfaces + 8 1000Base-T ports).
【Panel Design】
Top view, Bottom view and Rear view
Front view
Nanshan
District,
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Grounding screw
Relay alarm output terminal block
Console port
Power input terminal block
DIP switch
DIN-Rail mounting kit
Device running indicator RUN
Relay alarm indicator ALM
Power supply input status indicator P1/P2
1000Base-SFP Gigabit Ethernet SFP slot
10/100/1000Base-T(X) Ethernet port
Ethernet port status indicator:
【Mounting Dimension】
Unit: mm
【DIN-Rail Mounting】
For convenient usage in industrial environments, the product
adopts 35mm DIN-Rail mounting, mounting steps as below:
Step 1
Check if the DIN-Rail mounting kit is installed firmly.
Step 2
Insert the bottom of DIN-Rail mounting kit (one side
with spring support) into DIN-Rail, and then insert
the top into DIN-Rail.
Tips:
Insert a little to the bottom, lift upward and then insert
to the top.
Step 3
Check and confirm the product is firmly installed on
DIN-Rail, then mounting ends.
【Disassembling DIN-Rail】
Step 1
Device power off.
Step 2
After lift the device upward slightly, first shift out the
top of DIN-Rail mounting kit, then shift out the
bottom of DIN-Rail, disassembling ends.