Auber Instruments KIT-CUBE2S Installation Manual - Page 15

Browse online or download pdf Installation Manual for Controller Auber Instruments KIT-CUBE2S. Auber Instruments KIT-CUBE2S 15 pages.

Auber Instruments 
6. Testing. 
 
Before closing the enclosure with bottom plate, you can do a simple test with 240V input power 
and load. For example, wiring a 220V light bulb to test the heater output and use a 120V lamp to 
test the pump output. 
The EZBoil DSPR320 has initial status to be stop; one needs to press the run button once to start 
heating. And please remember to plug the sensor while testing. 
In the case if there is no power from the heater outlet, please check SSR indicator and controller 
OUT light action; they should work synchronously. 
If no power from the pump outlet when switch is at ON position, please check if fuse has been 
placed first. 
After test, apply hot glue or silicon sealant for controller and the 5‐15R pump outlets; these 
parts do not come with mounting screw, so they may go loose after time. 
In the end, close the enclosure by fastening the screws on the bottom plate and you can enjoy 
brewing with it. 
 
Appendix. Tools Recommendation 
Philip screw driver sets. 
Flat head screw driver sets. 
Ruler and caliper. 
Tweezer 
Wire cutter. 
Wire stripper.  
Wire crimper. 
Hot gun or multipurpose sealant. 
Multimeter. 
 
Copyright 2007‐2019, Auber Instruments All Rights Reserved. 
No part of this manual shall be copied, reproduced, or transmitted in any way without 
the prior, written consent of Auber Instruments. Auber Instruments retains the 
exclusive rights to all information included in this document 
 
v1.2 
Auber Instruments Inc. 
5755 North Point Parkway, Suite 99, 
Alpharetta, GA 30022 
www.auberins.com 
Tel: 770‐569‐8420 
 
15 
6/12/2019