AIRTUG HD Dumpster Tug GAS Assembly & Operating Instructions - Page 4
Browse online or download pdf Assembly & Operating Instructions for Farm Equipment AIRTUG HD Dumpster Tug GAS. AIRTUG HD Dumpster Tug GAS 5 pages.
Dumpster Attachment Installation:
1.
Dumpster Attachment - to be bolted or welded to dumpster
It is preferred that the Dumpster Attachment is welded to the dumpster but
it can also be bolted to the dumpster with the hardware included.
2.
Dumpster Attachment Arm: Pinned to Dumpster Attachment; incorporates
ball receiver
3.
Install the Dumpster Attachment Arm with the ball receiver into the
Dumpster Attachment
4.
Place the Dumpster attachment on the dumpster in the middle
of the end with the castering wheels so that the bottom of the ball
receiver is approximately 22" off the ground. The actual height off
the ground should be just high enough to get the ball of the tug
under it when the ball is at its lowest position.
5.
Mark the dumpster where the attachment needs to be
mounted to the dumpster. We recommend welding it to the
dumpster, if possible. If you are bolting it, mark the holes and drill
3/8" holes and secure it in place using the hardware supplied.
www.airtug.com
Approx. 23"