3P Technik DTC200 Installation And Operation Manual - Page 6

Browse online or download pdf Installation And Operation Manual for Controller 3P Technik DTC200. 3P Technik DTC200 16 pages.

3P Technik DTC200 Installation And Operation Manual

Connections

Mains Power Connection

The power supply to the control panel enters via a cable gland on the bottom right of the housing. Insert
the cable, connect to the large incoming power terminal on the right of the PCB, and tighten the cable
gland.

Pump/Valve Power Connections

Pumps or valves are powered from the 3 pin green terminals on the lower right of the PCB marked with
LNE. Terminal con6 supplies power to fill the tank, con7 for the chemical dosing pump, con8 drains the tank
con9 may optionally be used for a mixer/agitator/aerator to assist the reaction. The terminal blocks are
socketed and can be withdrawn from the PCB for ease of access.
DTC200 V1.20
Page 6
22/01/20