Dultmeier Sales DUFB_A-D Owner's Manual - Page 5

Browse online or download pdf Owner's Manual for Washer Dultmeier Sales DUFB_A-D. Dultmeier Sales DUFB_A-D 12 pages. Air pump foam brush system - demand

Equipment Placement
1. Select a mounting location on a wall at a height
where the unit can be easily serviced. Hold the
board level and mark spots on the wall for each
mounting hole on the board.
2. Use 5/16" bit to drill 1-1/2" deep holes into the
wall. Hold board on wall and insert 1/4" x 1-7/8"
sleeve anchors (provided) into drilled holes.
Tighten anchor nuts. (Fig. 1)
3. Install boom bumper on end of boom. (Fig. 2-D)
4. To mount boom(s), in bay(s) use the boom bracket
holes for a template. Place the boom bracket
with the single hole on top level against the wall
and mark a spot for each mounting hole. Since
all applications are different, be sure to use the
proper fasteners to secure boom bracket(s) to bay
wall(s). (Fig. 2-E)
5. Slide the top pivot shaft on the boom up into the
top hole of the boom bracket. Slide the bottom
pivot shaft into the right or left hole of the boom
bracket, depending on swing.
6. Place the foam brush manifold as close as possible
to foam brush boom. Run the 3/8" braided hose
from the boom (Fig. 2-H) to the discharge of
manifold. (Fig. 3-H) Secure with clamps.
7. Run 1/4" tubing (provided), from air and chemical
manifolds on Foam Brush System (Fig. 4) to the
foam brush manifold. (Fig. 3-I) Repeat this step
per bay.
8. If you purchased the optional brush holder part
number D627SS, mount the brush holder approx.
60" above floor level. Skip ahead to Step 11.
9. Mount the brush bucket at floor level. The weep
and floor heat system should ensure that the
brush does not freeze. The water will flow over the
bucket and will help keep the brush clean and free
of debris.
10. Position the hose hook on the wall directly above
the center of the foam brush bucket approx. 72"
from floor level. (Fig. 2-F)
11. Connect brush handle to foam brush head.
(Fig. 2-I)
12. Connect hose from boom to brush assembly.
(Fig. 2-G)
Installation & Operating Instructions | 3
Figure 1
H
E
Boom
Bracket
Figure 2
H
Foam Discharge to Boom in bay
Figure 3
Foam Brush Manifold
Figure 4
D
F
G
I
I
Air Inlet
I
Chemical Inlet