cashco 987 Installation, Operation And Maintenance Manual - Page 8

Browse online or download pdf Installation, Operation And Maintenance Manual for Control Unit cashco 987. cashco 987 15 pages. Globe-style pneumatic control valve body iom

Use the total number of revs en gage ment
recorded in Step V.B.4. as the guide to control
engagement of the stems (6) (4).
en gag ing the stems, rotate yoke nut (15) as
able to help stabilize top works, continue to
pres sur ize the ac tu a tor in 2-3 psi (.15-.20 Bar)
in cre ments in an al ter nat ing se quence with
the distance en gaged until the total num ber
of revs engaged is reached.
30. Hand-tighten yoke nut (15) until fully po si tioned
with the yoke (3) sitting on the bonnet (2).
VI. CALIBRATION
A. General:
1. This section only covers cal i bra tion of the
control valve with Actuator Models C27/C53.
2. Positioner, if in stalled, requires ref er ence to
the spe cif ic positioner mod el IOM for prop er
cal i bra tion pro ce dure.
3. All indicated items numbers that are with
re spect to IOM-C27-C53 will be in pa ren the sis
and un der scored; i.e. (20); those that
reference the po si tion er IOM will be in double
parentheses; i.e. ((AP)). All item numbers
that are with respect to this IOM-987 are not
un der scored; i.e. (3).
B. Procedure - Reverse Action, ATO-FC:
1. Reference the name plate (40) at tached to
the ac tu a tor yoke (3). De ter mine the bench
set ting of the in stalled range springs (10) from
the name plate (40); i.e. 5-15 psig (.34 -1.0
Barg), or 15-60 psig (1-4.1 Barg).
2. Connect a temporary air supply with an in-
line ad just able airset regulator and gauge to
the lower actuator con nec tion. See Section
IV.A.6 for appropriate supply pressure. DO
NOT LOAD with any air pressure at this point.
3. To determine when stem/plug (4) begins to lift
out of the seat, touch the stem below the jam
nuts with one finger. (Stem will move when
actuator pressure exceeds the spring load.)
4. Slowly pressurize the ac tu a tor to a pres sure
equal to the lower pres sure lev el of the bench
setting; i.e. for a 5-15 psig (.34 -1.0 Barg)
range, set pressure at 5 psig (.34 Barg). Take
note of the pressure reading when the stem
first begins to move.
8
31. Secure "dangling parts" - ac ces so ry plate ((AP))
and indicator washer (16) - to ac tu a tor stem (6)
While
with stem jam nuts (17).
32. Ham mer rap yoke nut (15) until tight. (Release
tem po rary air source.)
33. Install nuts (21) on studs (20). Use torque wrench
to tighten to 25-30 in-lbs.
SECTION VI
5. If the loading pressure for the start of stem
movement is below the lower end of the
desired bench setting, then the com bined stem
(4, 6) length is too short.
a. Rotate both jam nuts (17) down to base of
b. Increase pressure in the actuator to
c. Rotate upper jam nut CW to increase the
d. Rotate upper jam nut CCW to hold
e. Release all pressure from the actuator and
6. If the loading pressure for the start of stem
movement is above the lower end of the
desired bench setting, then the com bined stem
(4, 6) length is too long.
a. Rotate both jam nuts (17) down to base of
b. Increase pressure in the actuator to
c. Rotate lower jam nut CCW to shorten the
d. Rotate upper jam nut CCW to hold
e. Release all pressure from the actuator and
7. After the opening set point pressure has been
established, rotate lower jam nut (17) CCW up
tight under the upper jam nut.
8. Release all pressure from the actuator.
9. Observe the location of the in di ca ting washer
threads on stem (4) and tighten together.
approximately mid range of the bench
setting.
combined stem length. DO NOT allow
actuator stem (6) to rotate in the actuator.
indicating washer (16) up against stem
(6).
repeat Step 4 previous.
threads on stem (4) and tighten together.
approximately mid range of the bench set.
combined stem length. DO NOT allow
actuator stem (6) to rotate in the actuator.
indicating washer (16) up against stem
(6).
repeat Step 4 previous.
IOM-987