Danfoss VLT Automation Instructions Manual - Page 6
Browse online or download pdf Instructions Manual for DC Drives Danfoss VLT Automation. Danfoss VLT Automation 16 pages.
For the final installation of the duct work, as-
semble the top duct as shown in Photos 12, 13
and 14. Gasket is applied to several surfaces
as shown (refer to drawing 175R5631 Sheet 2,
exploded view of components). The top duct
closing plate is left off for the installation of the
duct work on the drive. The top duct work is
attached to the drive using existing holes on
the top cover of the drive. Use the 5 longer
screws (supplied with kit) to install the top duct
work.
The duct work will fit over the drive
mounting bolts.
Once the duct work is attached to the drive, the
duct closing plate can be attached. The top
duct work assembly is complete.
Photo 15. Gasket folds over the edge to
form seal between the duct and top vented
cover
Photo 16. Top duct installed
Instruction No: 175R5640 V3
Photo 12. Top duct assembled with gas-
ket
Photo 13. Gasket applied to both sides
drive bracket and grated cover
Photo 14. Top duct ready to be installed
on drive
Aug 13, 2008
Page 6
Closing plate