3T-Components 3T-MOTORS 3T45-20E Installation & Operating Instructions Manual - Page 8

Browse online or download pdf Installation & Operating Instructions Manual for Engine 3T-Components 3T-MOTORS 3T45-20E. 3T-Components 3T-MOTORS 3T45-20E 12 pages. Shutter motors with obstacle detection and electronic limit switches

3T-Components 3T-MOTORS 3T45-20E Installation & Operating Instructions Manual
INSTALLATION INSTRUCTIONS
On the opposite side of the motor, push the roller capsule out of the roller shutter shaft until it fits into the ball bearing inserted in the wall bearing.
Fix roller capsule to roller shutter shaft with self-tapping screw. Position the screw at a punched hole. This prevents the screw from slipping.
Roller capsule

Shutter motor wiring:

6
Connect the roller shutter motor and switch (or timer) to the mains.
The electrical connection of the roller shutter motor and control unit may only be carried out by qualified personnel.
If the drive should run in the opposite direction after installation, the motor's upstream and downstream leads (brown + black) must be turned.
Power grid
230 V / 50 Hz
1) brown / black = L1 / Phase
2) blue = N Neutral conductor
3) green/yellow = PE Protective conductor
Adjustment cable ESKS
The connection diagram of time switches differs from this
circuit diagram! Please refer to the corresponding manual
for the connection diagram.
1 (L1)
2 (N)
3 (PE)
Wall bearing +
Ball bearing
1 (Up/Down)
2 (Up/Down)
3 (N)
4 (PE)
1) black = Departure or ascent
2) brown = Departure or ascent
3) blue = N Neutral conductor
4) green/yellow = PE Protective conductor
1 (Up/Down)
2 (Up/Down)
3 (N)
4 (PE)
If the end points are set using the ESKS adjustment cable, do
not connect the switch or timer until after the end positions
have been set (page 9)!
3T-MOTORS Tubular motors | Installation instructions
Shutter motor
230 V / 50 Hz
Shutter motor
230 V / 50 Hz
8