Danfoss APP 16-22 Disassembling And Assembling Instructions - Page 7
Browse online or download pdf Disassembling And Assembling Instructions for Water Pump Danfoss APP 16-22. Danfoss APP 16-22 18 pages. Changing pistons
Also for Danfoss APP 16-22: Instruction Manual (8 pages)
Instruction
3.
Assembling the pump
Disassembling and assembling APP 11-13 and APP 16-22
20.
Remove the remaining screws in port
flange using the 13 mm combination
wrench.
Important:
It is essential that the pump is serviced in
conditions of absolute cleanliness. All parts
must be absolute clean before mounting.
Note: Place the pump on a pallet or other
stable surface above the ground. Ensure that
the pump cannot roll. It must be possible to
place the pump vertically with the shaft
pointing downwards. This can be done
between two pallets or between two boards on
a pallet provided that the distance is minimum
100 mm (3,94 inch) – see photo page 4 para-
graph 7.
1.
Lubrication
•
To prevent seizing-up, lubricate threads on
screws.
•
O-rings inside pump must be lubricated
only with clean filtered water.
•
O-rings for port flange, end flange and
black O-ring on flushing valve must be
lubricated.
•
It is important to lubricate ALL parts before
and during assembling with clean filtered
water. (Especially all PEEK parts)
180R9228 / 521B1181 / DKCFN.PI.013.A2.02 / 10.2013
21.
Carefully separate house and port flange.
Ensure that the guide pin for the position-
ing of the house is not lost. For further
disassembling of flush valve, see page 14.
WARNING:
Do not use silicone when assembling the
pump.
Do not reuse disassembled O-rings as they
might be damaged. Always use new O-rings.
Do not reuse the shaft seal, due to risk of
leakage.
2.
Place port flange as illustrated.
3.
Insert guide pin for positioning housing on
port flange. Ensure that two screw holes
can be reached from below.
7