Danfoss iC7 Series Installation Manual - Page 11

Browse online or download pdf Installation Manual for Media Converter Danfoss iC7 Series. Danfoss iC7 Series 16 pages. In-bottom/out-back cooling kit for fa09-fa10, frequency converters
Also for Danfoss iC7 Series: Installation Manual (8 pages), Installation Manual (8 pages), Installation Manual (6 pages), Installation Manual (14 pages), Installation Manual (16 pages), Installation Manual (8 pages), Installation Manual (8 pages), Installation Manual (10 pages), Installation Manual (16 pages), Installation Manual (16 pages), Installation Manual (6 pages), Installation Manual (6 pages), Installation Manual (18 pages)

Danfoss iC7 Series Installation Manual
In-back/Out-back Cooling Kit for FA09-FA10
Installation Guide
1.
Peel the paper from the side gaskets, and press to attach the gaskets to the duct frame.
Align the holes in the side gaskets with the holes in the left and right sides of the back opening of the duct frame.
2.
Place the grill over the left and right gaskets, with the threaded studs in the grill going through the middle holes in the
gasket and into the duct frame.
3.
Secure the grill to the duct frame using 1 M5 nut on each stud.
Torque to 2.3 Nm (20 in-lb).
4.
Affix the grill gasket to the outer side of the back grill.
5.
Affix the duct base gasket to the duct base cover.
6.
Secure the base cover to the underside of the duct frame with 12 M5 nuts (for FA09) or 14 M5 nuts (for FA10).
Torque to 2.3 Nm (20 in-lb).
7.
Place the front gasket on the front side of the duct frame, making sure the holes in the frame and gasket align.
8.
Affix the top gasket to the top of the duct frame.
Wait to attach the front duct cover until the lower duct assembly is installed in the cabinet.
1
2
3
4
Illustration 9: Assembly of Lower Duct
Danfoss A/S © 2022.03
Installation
AN371942471353en-000101 / 136R0248 | 11
5
6
7
8
9
10