Free2Move eSolutions Annex Installation Manual - Page 4
Browse online or download pdf Installation Manual for Automobile Battery Charger Free2Move eSolutions Annex. Free2Move eSolutions Annex 11 pages. Advanced functionalities setup
Also for Free2Move eSolutions Annex: Installation Manual (14 pages)
2.1
ENERGY METER INSTALLATION
During the installation always refer to the meter installation manual
included in the package.
1.
Place the Power Meter provided after the main utility meter and before the split
power.
Eletrical panel
Utility Meter
2.
For the three-phase or single-phase electrical connection, refer to the dedicated
meter installation manual included in the Power Meter package.
3.
Feed the Modbus communication cables through the eProWallbox box sheath (C).
Suggested cable: STP class 5E, 0.5 mm
4.
Use the following order for connecting the communication cables from the
PowerMeter to the eProWallbox. Starting from left on the eProWallbox
RS485 output port CN12.
PowerMeter
Installation manual - Annex
PowerMeter
Gavazzi EM330
13 12 11 10
GND A- B+ T
GND -
+
CN12 Port
A d v a n c e d f u n c t i o n a l i t i e s s e t u p
Loads
section.
2
Gavazzi EM111
7
6
8 5
GND B+ A- T
GND -
+
CN12 Port
RS485 Port
Finder 7M
A SC B
GND -
+
CN12 Port