Duratuf KIWI SHEDS KS1 Assembly Instructions Manual - Page 16
Browse online or download pdf Assembly Instructions Manual for Storage Duratuf KIWI SHEDS KS1. Duratuf KIWI SHEDS KS1 18 pages.
Step 3: On the left hand Door Jamb, position latch as
shown, at correct height to door handle. Rivet
in place with four rivets.
RAISED FLOOR MODIFICATION
For sheds being placed on a purpose built floor, (concrete, cob-
bles, ply etc.), the Wall Sheets will protrude 20mm below the
Base Plate. This will stop water flowing in between the Base
Plate and Floor.
The Floor should be made 15mm smaller than Base Size.
Note:
Although it is not essential, fitting Damp Proof Course
in between the Base Plate and the Floor will give add-
ed protection against moisture.
•
Remove all swarf (drill filings) with a soft brush or rag.
•
Hose down roof and walls thoroughly.
•
For Coloursteel sheds use touch-up paint provided on all nail heads, rivets and exposed cuts.
SECURITY DOOR (Optional)
CLEAN UP
16