Aplast AQUAstay Instructions For Installing - Page 8
Browse online or download pdf Instructions For Installing for Water Heater Aplast AQUAstay. Aplast AQUAstay 8 pages.
4. ASSEMBLY OF THE LID AND FINISHING WORKS
After the backfilling of the tank is finished, the height of the manhole has to be adjusted to the surrounding terrain by cutting the ring
of the tank. Factory-made tags, which allow horizontal cutting, have been made for this purpose. The tank can be made higher, but
the total height of the reservoir must not exceed h + 500mm.
Ring H = 250 mm
Ring H = 500 mm
Gasket
The tank has a factory-installed walkable PE lid with seal, which can be replaced with a cast-iron lid at the request of the buyer. Prior
to any assembly of the lid, the seal of the lid must be cleaned and lubricated with a food-grade lubricant. In the case of a lid with a
seal, a safeguard can be ordered as an extra, which protects the lid from being opened. This is especially important when children or
under-age persons are in the vicinity of the tank. The decision of choosing a lid with a safeguard is made by the buyer; hence in the
event of an accident, the seller and manufacturer shall not be held liable for potential consequences if a lid without a safeguard has
been chosen.
APLAST proizvodnja in trgovina d.o.o.
Petrovče 115a, 3301 Petrovče | Slovenia
t +386 (0) 3 713 24 50
f +386 (0) 3 713 24 54
w www.aplast.si
LOCK
Safeguard
UNLOCK
Type
x (mm)
L
200
XL
240
XXL
300
8