APlusLift HW-8S Installation & Operation Manual - Page 7

Browse online or download pdf Installation & Operation Manual for Lifting Systems APlusLift HW-8S. APlusLift HW-8S 19 pages. 4-post portable storage car lift

Step 2 (Setting up Columns and Rails)
• Lay out the columns (x4), tracks (x2), and cross rails (x2).
• Place the cross rails into the column, aligning the locks and the steps on the same
side.
• Slide the cross rail to the lowest position. Release the lock rod to do so. Repeat these
steps for each of the other columns.
• Place the runway across the cross rails, the lip should be resting on the cross rails,
smooth part facing outwards.
• Install the runway hardware (large bolts (x8), flat washers, lock washers, nuts, and
ramp hangers)
7