APlusLift HW-9KOH Installation Manual & Operation Instructions - Page 10

Browse online or download pdf Installation Manual & Operation Instructions for Lifting Systems APlusLift HW-9KOH. APlusLift HW-9KOH 17 pages.

CONNECTING POWER UNIT & HYDRAULIC HOSES
Using four hex bolts mount the power unit to the main side column.
Install the TEE fitting into power unit. Install 4.3 inches extended fitting into the bottom of each cylinder. Small
thread with sealing washer for cylinder. Large thread for short hydraulic hose and long hydraulic hose.
Connect short hydraulic hose to the TEE fitting in power unit. Run the short hose down the side of column. Connect
the short hose to 4.3 inches extended fitting in bottom of cylinder.
Connect Long hydraulic hose to the TEE fitting in power unit. Run the long hose up the side of column. Run the
hose cross the overhead beam. Run the hose down to the side of opposite column. Connect long hydraulic hose to 4.3 inches
extended fitting in bottom of cylinder. DO NOT over tighten, as you will crack the fitting. Connect long hydraulic hose
between the cylinders and let it lay inside the floor pan. See figure 5 for hose layout and routing to the power unit.
You could find one Tee fitting and two extended fitting in the bag of fasteners.
Figure 4.
10