Daspi MAU Instruction Manual - Page 7

Browse online or download pdf Instruction Manual for Gate Opener Daspi MAU. Daspi MAU 16 pages. Swing gates operator

Foresee in the boxes holes "F2" the protective coverings for the
power supply cables
(fig.
3). Put inside of the boxes pins "P1" the
spheres "Sf" so grease the pins "P1" , the spheres "Sf" and the holes
of the levers "L1" and after install the levers "L1"
Block the boxes in the holes with concrete and make sure that the
boxes are perfectly horizontal, check that the pins "P1" are aligned
with the pivots and that the levers "L1" touch the lower border of the
leaves
(fig.
6). Put the gear motors on the bottom of the boxes and
orient them like in the
fig.
1-2, fix them to the tapping-screws with the
nuts "D1"
(fig.
7). Install the transmission levers "L2" making coincide
its holes with the pivots of the levers "L1" and "L3" , fix the supplied
safety screws "V1"
(fig.
8). Install the covers of the boxes checking if
you forgot something's in the same. Aligned the levers "L1" with the
leaves and fix them provisionally to the lower border by welding
9). Release the gear motors like in the par. "Emergency or manual
manoeuvre" and carry out a manual manoeuvre in opening and
closing, to control the correct position of gear motors. Fix definitively
the supports "L1" by strong and good welding.
Never carry out circuitries inside the metal boxes.
Make the circuitry like in the control panel manual and install the
obligatory safety devices. Teach the people intended for the use
of the automation about the controls, safety devices, emergency
manoeuvre and dangerousness deriving from the utilize of the
automation. Compile the technical booklet and fulfil the eventual
obligations deriving from the regulations in force.
To avoid dangerous situations that can cause accident or damages to
things or persons, before starting the opening or closing manoeuvres
of the leaves make sure that the covers are installed and that anyone
is nearby the mechanism in movement and that anything's, as
tools or cable, is inside the boxes. Never carry out any adjustment
operations without box cover or with the gear in working, before to
operate into the boxes make sure that the gear motors operations is
finished and that the power supply is disconnected included possible
batteries.
FIn-MeCC VersIon
The application to the MAU gear motor of the mechanical limit
switches assures an exact and safe stop, of the two leaves, in the
wanted position. Verify to have the right foundation boxes suitable
for the installation of the device: cod. No. DAA22002 BOX FIN-
MECC. Make the installation of the foundation boxes and of the
gear motors as per the standard model. Install the blocks "Bc" , that
assure the closing stop of the leaves, with the screws "Vc" on the
support situated in the exterior side of property
blocks "Bc" the adjust screws "Vr" with blocking nut "D2" screwing
completely, and verifying that the same touch the levers "L1"
Install the special transmission levers "Ba" making coincide its holes
with the pivots of the levers "L1" and "L3" , fix the supplied safety
screws "V1"
(fig.
12). Install on the lever "Ba" the adjusting screws
"Vr" with blocking nuts "D2" screwing completely
Install the boxes covers and conduct the gates leaves in maximal
opening position wished. Cut off the power supply and the boxes
covers. Unscrew the adjust screws "Vr" applied on the levers "Ba"
till it lays on levers "L1" so fix the nuts "D2"
covers and conduct the gates leaves in the closing position wished.
Cut the power supply and the boxes covers. Unscrew the adjust
screws applied on the blocks "Bc" till it lays on levers "L1" so fix the
nuts "D2" (fig.11). Install the boxes covers and carry out a complete
movement of the leaves to verify the correct adjusting of the stops,
in case adjust with the screws "Vr" always cutting the power supply
before.
(fig.
5).
WarnIng
(fig.
10). Install on the
(fig.
13).
(fig.
13). Install the boxes
FINN-MECC device does not replace for any reason and in any case
any safety device necessary for the regulation of the installation
Dl-180 VersIon
The device DL-180 has been applied to the gear motor MAU to allow
openings until 180°. Therefore, it is necessary to check the presence
of enough space for such an opening where the gate is supposed
to work. Verify to have the right foundation boxes suitable for the
device assembling: cod. no. DAA220022 BOX FIN-MECC. Carry out
the installation of the boxes and the gear motors as for the standard
model, installing instead of the standard levers "L1" the levers "Lp"
supplied with the kit
(fig.
Install on the gear motors the pinions "Pm" instead of the standard
levers "L3"
(fig.
"V2" always on the side of the pinions "Pm"
Install the pinions "Pr" on the blocks "D" and fix them with safety
screws "V3"
(fig.
the transmission chain "C" between the levers "Lp" , the pinions "Pr"
and "Pm" , close them with the supplied link
Grease the chains. We recommend to check periodically their state of
Lubrificate, and when necessary grease them.
To avoid dangerous situations that can cause accident or damages to
things or persons, before starting the opening or closing manoeuvres
of the leaves make sure that the covers are installed and that anyone
is nearby the mechanism in movement and that anything's, as tools
or cable, is inside the boxes.
Never carry out any adjustment operations without box cover or with
the gear in working, before to operate into the boxes make sure that
the gear motors operations is finished and that the power supply is
disconnected included possible batteries.
DL-180 device does not replace for any reason and in any case any
safety device necessary for the regulation of the installation.
We garantize the correct functioning of FIN-NECC and DL-180
versions only and exclusively if provided by DASPI and only if
combined with the original control panel.
eMergenCy or Manual ManoeuVre
You have to do the emergency or manual manoeuvre or during the
installation, or only if the automation does not work properly or if
there is not power supply.
Put the supplied key "CHS" in the hole "V" and turn the left leaf
clockwise or the right leaf anticlockwise, to free the gear, so open the
gate manually
(fig.
(fig.
11).
of the automation, you have to put the leaf in the starting position
(it start automatically). Place the key "CHS" in a safety place known
exclusively from the people intended for the use of the automation.
Switch on the power supply, pay attention that there's nobody where
the gate is moving.
(fig.
14).
14). Fix the blocks "D" on the boxes by the screws
15). Cut the power supply, if it's switch on, and put
(fig.
WarnIng
CUT OFF THE POWEr SUPPLy
17). In order to re-establish the normal functioning
(fig.
15).
16).