Cayken 850F Operating Instruction - Page 4

Browse online or download pdf Operating Instruction for Tools Cayken 850F. Cayken 850F 9 pages.

PRODUCT MODEL AND PARAMETER
200F
400F
ITEM
Largest drill
200mm
400mm
N.W
20Kg
21Kg
Adjustable angle
0-45°
0-45°
In order to continuously improve products, the company reserves the right
of the technical data and the right parts to change without prior notice.

SAFETY PRECAUTION

1、Please power off before any adjustment of the machine. unexpected start is the result
of accident.
2、Please assure the correct assembly of the drilling frame before install the machi-ne.
This is important for avoiding the collapse.
3、Please fix the machine to the firm drilling frame before starting the machine. The
movement of the machine on the stand will lead the lack of control.
4、Please put the drilling stand on stable and flight floor. It will be hard to control the
machine safely when the stand moveable or rockable .
5、Please do not overload the stand or using ladder scaffold. The overload of the stand
top will lead to the falling.
6、Please clear up the site and assure enough stable space. And pls pay attention to the
unexpected movement of any obstacle.
7、When doing deep drilling (from one side to the other), please check the other side
where the drill head will out of. pls fix and segregate this area to assure no harm to any
body or material.
8、Please be equipped with the following accessories when proceeding.
head-protection cap
ear-protection device.
goggle or dust-proof mask.
respirator / protection glove
Cloth keep you move freely.
boots with steel toe protection
First-aid box should be stand-by. pay attention to the cloth, long hair and jewelry
that could be twist into the moving part.
650F
280F
580F
650mm
220mm
480mm
750mm
24Kg
22Kg
24Kg
0-45°
0-45°
0-45°
If you still not clear for the operational process after checking the this manual,
Pls consult the professional person.
If you have any question about operating this machine, pls contact with your
850F
dealer.
We will always on you with all sincerity to ensure your efficiency and safety .
26Kg
0-45°
INSTALL THE STAND
There have two ways to install the stand
Using vacuum suction plate fixation
Using expansion bolts or anchor fixation
Using vacuum suction plate fixation
First install the vacuum seal on the pedestal, then connecte vacuum pump to
vacuum pressure fast connection, take the base on the desired location, start
the vacuum pump, must achieve to the minimum pressure :635 mm hg (25
inches),so that the base can seal on the surface.
Using expansion bolts or anchor fixation
Drill a hole at the position of determining by expansion bolt or anchor, tight-
en the firm base, and then check carefully whether the expansion bolt fixed
correctly, can use spanner to adjust the base screw adjust the base according
to the basement.
3
4
Warning: the vacuum suction plate can ' t used in the ceiling or wall
drilling.it may result in serious or fatal injury with negligence or imp-
roper use, if the use of vacuum suction plate, to ensure the bearing
surface is not porous, and its thick loose, make sure that the vacuum
pump have enough suction to the fixed vacuum suction plate.
Note: if you need to fixed on the wall, it is better to take out the
head for installation and fixed stand, installed on the rack after
the stand fixed, please make sure installed the head on the stand
and screw has been tightened.(if need help, with spiral crane
transferred to the appropriate length to fixed)