COOK EPD Installation, Operation And Maintenance Manual - Page 10

Browse online or download pdf Installation, Operation And Maintenance Manual for Fan COOK EPD. COOK EPD 17 pages. Propeller wall fan

COOK EPD Installation, Operation And Maintenance Manual
XLW / XMW
Exhaust
4
2
3
12
1
9
11
10
13
Rotation
Supply
4
2
3
12
1
9
11
10
13
Rotation
XLWH / XMWH
Exhaust
2
3
4
11
1
12
10
13
Rotation
Supply
2 3
4
11
1
12
10
13
Rotation
Part
Description
1
Power Assembly Rail
2
Base
3
Prop
4
Power Assembly Feet (3)
5
Shaft
6
Bearings (2)
7
Venturi
Note: Since 2012, the venturi and base are one piece.
Air Flow
6
5
8
7
Air Flow
6
5
8
7
Air Flow
6
5
9
8
7
Air Flow
6
5
9
8
7
Part
Description
8
Motor
9
Motor Plate
10
Drive Sheave
11
Driven Sheave
12
Belt
13
End Wire Guard
XLP / XLPH / XMP / XMPH
Exhaust
11
1
5
4
8
2
10
9
6
13
7
Air Flow
3
Supply
11
1
5
4
8
2
10
9
6
13
7
Air Flow
3
10
12
Part
Description
14
1
Base
2
Prop
3
Venturi
4
Shaft
5
Bearings (2)
6
Motor
7
Motor Plate
12
8
Driven Sheave
14
9
Drive Sheave
10
Belt
Mounting Collar
11
Angles (4)
12
Anchor Angles (2)
13
End Wire Guard
14
Shutters
Note: Since 2012, the
venturi and base are one
piece.