AFCO AF 919155 Installation & Operation Instructions - Page 2
Browse online or download pdf Installation & Operation Instructions for Accessories AFCO AF 919155. AFCO AF 919155 4 pages.
AF 919155 • Pump Fed Sanitizer
Safety & Operational Precautions
For proper performance do NOT modify, substitute nozzle, hose diameter
or length.
Manufacturer assumes no liability for the use or misuse of this unit.
Wear protective clothing, gloves and eye-wear when working with
chemicals.
Always direct the discharge away from people and electrical devices.
Follow the chemical manufacturer's safe handling instructions.
Turn off solution supply when unit is not in use for extended periods.
TO INSTALL
(REFER TO DIAGRAM, NEXT PAGE.)
1. Mount the unit to a suitable surface.
2. Connect the discharge hose as shown in the diagram and close the ball valve.
3. To prevent blocking the small jets flush any new plumbing of debris before connecting. And/or install a
strainer. (see options)
4. Connect pre-mixed solution supply line.
TO OPERATE
Always make sure the discharge ball valve is closed or pointed in a safe direction before turning inlet
valve on. Discharge valve can be shut off at any time during operation but should not be left off for
long periods of time with the inlet valve on.
1. With discharge wand in hand open the inlet ball valve. Then open the discharge ball valve to begin
application.
2. When sanitizing is completed, close the discharge ball valve then close the inlet ball valve.
3. Briefly re-open the discharge ball valve to relieve pressure in hose. If applicable rinse the work surface
before solution dries.
- Page 2 -
Flow Rate Chart
Pressure
Flow Rate
PSI
GPM
40
1.70
50
1.90
60
2.08
70
2.25
80
2.40
90
2.55
100
2.69
110
2.82
120
2.94