BENDIX AD-9si Service Data - Page 6

Browse online or download pdf Service Data for Dehumidifier BENDIX AD-9si. BENDIX AD-9si 16 pages. Oil coalescing air dryer

BENDIX AD-9si Service Data
Compressor
Control
Port
Turbo
Cut-Off
Valve
(Open)
Supply
Port
Safety
Valve
Figure 4 – Bendix
AD-9si
®
The actual regeneration of the desiccant drying bed begins
as dry air from the purge volume flows through the purge
orifice into the desiccant bed. Pressurized air from the
purge volume expands after passing through the purge
orifice; its pressure lowers and its volume increases. The
flow of dry air through the drying bed regenerates the
desiccant material by removing any water vapor adhering
to it. Approximately 40 seconds are required for the entire
contents of the purge volume of a Bendix
dryer to flow through the desiccant drying bed. This time
will increase if the dryer is fitted with an extended purge
reservoir.
6
Oil
Coalescing
Filter
Control
Line
Exhaust
Purge
Valve
Air Dryer without a Governor — Charge Cycle
®
AD-9si
®
Desiccant
Bed
Purge
Orifice
Purge
Air
The delivery check valve assembly prevents air pressure
in the brake system from returning to the air dryer during
the purge cycle. After the purge cycle is complete, the air
dryer is ready for the next charge cycle to begin.
air
®
Extended
Purge
Port
Reservoir
Delivery
Check
Valve
Front
Reservoir
Delivery
Port
Rear