Bretford MSB-F3 Assembly Instructions - Page 2
Browse online or download pdf Assembly Instructions for TV Mount Bretford MSB-F3. Bretford MSB-F3 5 pages. Floor infeed liquid workspace
Substation
Floor
monument
Note 1. :
Substation Channel instruction sheet step 1 thru step 3 must be completed before
wiring can be done.
Note 2. :
The open end of the Infeed is to be installed by a certified electrician.
Will require cover plate to have 1 1/8" knock out and an appleton 7289v
connector to complete connection.
Plug the other end of the Infeed into the Junction Box. Close the
Substation Skins.
Steps to connect Floor Infeed to Junction Box
parts removed
Infeed
open end
STEP 1
Substation
for clarity
Substation
skin open
position
Infeed
Junction Box
Fig. 1