HHP PBNU-LD16P120 Installation Instructions Manual - Page 16

Browse online or download pdf Installation Instructions Manual for Furnace HHP PBNU-LD16P120. HHP PBNU-LD16P120 20 pages. Gas-fired furnaces high-efficiency upflow condensing models

2. Remo ve the acce ss pane ls.
3. D iscon ne ct the two wire harness plugs from the top of the
control box.
4. Remove the four screws holding the control box and
position it out of the way.
5. Remove the hoses from the top of the condensate drain
trap, and one at the front of the trap.
6. Remove screws which retain blower to the blower deck.
7. Remove the blower assembly with the condensate drain
trap and the control wiring still attached.
8. Vacuum the motor and the blower wheel using a soft brush
attachment. Care must be used not to disturb the balance
weights (clips) on the blower wheel vanes.
9. Before reinstalling the blower assembly, inspect the lower
portion of the secondary heat exchanger which is visible
directly above the blower opening in the blower deck. If it
requires cleaning, vacuum it with a soft brush attachment
and follow the direction of the fins.
10. Reinstall the blower assembly and the condensate drain
hoses. Replace the mounting screws that hold the blower
to
assembly
the front portion of the blower deck. The two
mounting screws :used on the sides of the blower are used
for shipping purposes only, and are not necessary after the
furnace has bee n installed.
11. Reinstall the control box and reconnect the wiring harness
plugs.
12. Replace the access doors and restore the electrical supply
to the unit.
WARNING: If
the condensate drain trap has been emptied
during this cleaning procedure, refill it by following the
i
stru
tions found
n
c
in the •start-Up and Adjustment" section
this instruction.
on
13. O p e rat e the unit for a minimum of five minutes and care­
fully check for any leaks in the condensate drain connec­
tions.

TROUBLESHOOTING

CAUTION:
ing controls. Wiring errors can cause improper and dan­
gerous operation. Verify proper operfjltion after servicing.
-
The following visual checks should
bleshooting:
1. Check to see that the power to the furnace and the 50E4 7
control module is ON.
2. The manual shutoff valves in the gas line to the furnace
must
3. Make sure all wiring connections are secure.
Review the sequence of operation.
4
Start the system by setting th. e _ thermostat above the room
temperature. Observe the system's response. Then use the
Troubleshooting Table to check the system's operation.
Start the system by reading the upper left-hand box and the n
following the instructions in each box. If the condition described
in the box is true (yes answer), go down to the next box. If the
condition is not true (no answer), go to the box to the right.
Continue checking and answering the questions in the boxes
until the problem is explained and corrective action is de·
scribed. After any maintenance or repair, the troubleshootin g
sequence should
obtained.
WARNING:
controls with UPG Source 1 Parts.
Label all wires prior to disconn ection 'Nhen servic­
be
be
open.
be
repeated until normal system operation is
try
Do not
to repair controls. Replace defective
650.65-N2
made before trou­