Dyna-Glo RMC-LPC200L User's Installation, Operation And Maintenance Manual - Page 6

Browse online or download pdf User's Installation, Operation And Maintenance Manual for Heater Dyna-Glo RMC-LPC200L. Dyna-Glo RMC-LPC200L 15 pages. Propane construction heater
Also for Dyna-Glo RMC-LPC200L: User's Installation, Operation And Maintenance Manual (11 pages), User's Installation, Operation And Maintenance Manual (14 pages)

Dyna-Glo RMC-LPC200L User's Installation, Operation And Maintenance Manual
NEVER LEAVE THE HEATER UNATTENDED WHILE BURNING!
Assembly Time: 10 minutes
Contents
All Models: Unit, Manual, Hose and Regulator

Assembly

LPC80 and 200 Series Include:
Upper Shell, Lower Shell and Hardware Kit With
Screws (8)
Tools Required for Assembly
All Models: Adjustable Wrench
LPC80 and LPC200 Series: Phillips head screwdriver

Slide upper shell assembly up and off lower shell.

For Technical Support or Troubleshooting, Call: 1-877-447-4768
www.ghpgroupinc.com
5