Great Lakes GL480E-2432 Installation Instructions Manual - Page 9
Browse online or download pdf Installation Instructions Manual for Enclosure Great Lakes GL480E-2432. Great Lakes GL480E-2432 13 pages. Equipment cabinet/rack
MOUNTING RAILS
The vertical mounting rails
(2 pair - 12 Ga. steel) come
installed with all standard
Great Lakes cabinets at
19" EIA spacing; universal
mounting (3/8" sq. hole);
310-E compliant. The rails
can be adjusted front
to rear by loosening the
1/4"-20 hex nut and sliding
to desired location then
retighten the hex nut (7/16" wrench or socket).
VERTICAL POWER STRIP MOUNTING
For your convenience, we have provided mounting brackets in the
left rear and right rear corners of the GL480E and GL600E cabinets
for mounting the 7218-24 power strips vertically. Typically any power
strip shipped with an cabinet will be installed at the manufacturer. To
install a power strip in the field, remove the top power strip bracket by
loosening the #10-32 x 1/2" lg. screw that secures the bracket to the
frame. Slide the power strip into the lower power strip bracket.
Re-attach the top power strip bracket to secure the power strip.
Note: GL300E cabinet comes with 7219 powerstrip for 19" mounting.
Mounting
bracket
Qty.- 2 per
power strip
Power strip
#10-32 x 1/2"
lg.Phillips pan head
screw Qty.- 2 per
power strip
POWER
When using power distribution units (PDUs), each PDU should
be connected to a committed branch circuit that is rated for the
continuous load of all the equipment connected. When not using a
PDU, each piece of equipment should be connected to a dedicated
branch circuit.
9