HiB Novum Aeon Fitting Instructions - Page 4

Browse online or download pdf Fitting Instructions for Indoor Furnishing HiB Novum Aeon. HiB Novum Aeon 4 pages.

HiB Novum Aeon Fitting Instructions
Furniture Removal
The Aeon furniture range is installed with safety locking wall brackets
These wall brackets securely hold the furniture in place once installed and prevent any possibility of the
furniture being lifted off the wall.
If at any point the furniture needs to be removed from the wall - a pointed object such as a screwdriver
should be inserted into the wall bracket as shown in Fig. 9 below, and the furniture lifted out of the wall
bracket.
Fig. 9
Cleaning
To preserve the high quality finish of your HiB product, please ensure you regard the following care
and cleaning recommendations:
• Use only a soft damp cloth.
• Wipe off all water spillages as soon as possible
• DO NOT USE any abrasives or solvents.
Aftercare Service
In the unlikely event that this product should fail please contact the retailer from which the item was
purchased.
T:
+44 (0)20 8441 0352
Building 3, North London Business Park, Oakleigh Road South, New Southgate, London. N11 1GN
©HiB Copyright: No part of this document may be reprinted or duplicated without HiB consent. All sizes and measurements are approximate, but we do try and
make sure they are as accurate as possible. In the interest of continuous product development, HiB reserves the right to alter specifications as necessary. E & OE.
F:
+44 (0)20 8441 0219
E:
hibnovum.co.uk