Gaggia MD conik Operating Instructions Manual - Page 6

Browse online or download pdf Operating Instructions Manual for Coffee Grinder Gaggia MD conik. Gaggia MD conik 15 pages. Doser coffee-grinder
Also for Gaggia MD conik: Specifications (4 pages)

Gaggia MD conik Operating Instructions Manual
ENGLISH
1
GENERAL INSTRUCTIONS
1-1
Before starting up the appliance, carefully read the following instructions.
1-2
This appliance has been designed for professional use only and hence
must only be used by trained personnel familiar with its operation.
1-3
Keep the appliance well clear of water jets, damp areas and heat sources.
1-4
Always consult a qualified electrician for repairs and maintenance.
2
DESCRIPTION OF APPLIANCE (Fig. 1)
A)
Coffe tub lid
B)
Coffee tub
C)
Coffee tub hatch
D)
Dispenser lid
E)
Coffee dispenser
3
INSTRUCTIONS FOR FITTING THE BELL TO THE BODY OF THE
DOSER COFFEE-GRINDER OR COFFEE-GRINDER
3-1
The bell must be fitted before using the doser coffee-grinder or coffee-grinder.
3-2
Align the hole of the bell with one of the holes of the adjusting ring-nut (Fig. 2).
3-3
Ensure that the fan does not prevent you removing the dispenser cover or
lowering the stop pin of the adjusting disk - if it does, change holes.
3-4
Fasten, using the appropriate screw.
4

INSTALLATION

4-1
Installation must be carried out in strict compliance with the provisions of
law currently in force in the country of use, with particular reference to said
country's accident and fire-prevention requirements and electricity
authority regulations.
4-2
Before connecting the appliance to the mains supply, make sure that the
voltage indicated on the data plate is commensurate with that of the mains
supply.
4-3
Carefully clean all the components (see point 6).
4-4
Make sure that the switch is off (position 0).
4-5
Insert the plug in the power inlet.
4-6
Tampering with the appliance or failure to comply with the relative
connection requirements causes undue danger and consequently renders
the manufacturer's guarantee null and void.
5

OPERATION

5-1
Place the coffee beans in the tub, open the hatch and switch on, operating
the machine until the desired quantity of powder has been ground. Measure
out the ground coffee, pulling the lever.
5-2
Never fill the coffee dispenser more than 2/3rds.
5-3
The automatic doser coffee-grinder model starts and stops automatically.
Always switch off the appliance when not in use and at the end of the day.
5-4
Regulating ground coffee granule size (Fig. 3): lower the check pin on
G)
Press
H)
Switch
I)
Grinder plate
L)
Body of machine
F)
Measuring lever
3