DynaGen GSC200 Installation And User Manual - Page 11
Browse online or download pdf Installation And User Manual for Controller DynaGen GSC200. DynaGen GSC200 11 pages. Auto start engine & transfer switch controller
All of the features of the GSC200 that are user selectable or adjustable can be selected or adjusted by using the
GSC200 Configurator, the exception to this is the Exerciser Function which can only be programmed by the use
of the front panel buttons.
Programming the Exerciser Function
To enable the Exerciser Function of the GSC200, press and hold the Auto button, the Auto button must remain
held until the entire process is complete, after about 8 seconds the GREEN Engine Run LED will blink, after
the LED blinks press the Manual button the correct amount of times to set the interval between Exercise cycles.
The following chart shows the intervals that correspond to the number of times to press the Manual button.
NOTE: Please make note of the exact time that the programming of the Exerciser Function was done as there is
no way to retrieve this information from the controller once programming is complete. This will be the time that
the Exerciser will activate each time.
Once you complete the programming of the Exerciser the controller will immediately perform an Exerciser
cycle. The cycle begins with the GREEN Engine Run LED beginning to blink for 60 seconds, this is the alert
that an Exerciser cycle is about to begin. Once the alert time expires, the generator will start and if LOAD is
selected in the Configurator software the transfer switch will transfer to the generator source. If NO LOAD is
selected in the Configurator software then the generator will simply run for the duration of the cycle with no
transfer from the utility source. The duration of the Exerciser cycle is 15 Minutes plus the Cooldown period if
Cooldown is selected in the Configurator software.
Once the Exerciser cycle has begun you can interrupt the cycle by pushing the OFF button, however the time
will continue to count down so if the controller returns to AUTO the generator will start.
To disable the Exerciser Function, press and hold the Auto button, the Auto button must remain held until the
entire process is complete, after about 8 seconds the GREEN Engine Run LED will blink, after the LED blinks
press the OFF button and the Exerciser Function will be disabled.
NOTE: If at any time the battery is disconnected from the controller, the Exerciser Function will be reset to
disabled and the controller will again flash the indication that the Exerciser Function is not programmed when
the controller is put into Auto mode.
Operating & Installation Manual for the GSC200 Controller
PROGRAMMING THE GSC200
Number of Button Presses
1
2
3
4
Interval Time
Once Every 1 Week
Once Every 2 Weeks
Once Every 3 Weeks
Once Every 4 Weeks
10