Celestica Athena Erp lot9 EcoDesign Manual - Page 14
Browse online or download pdf Manual for Controller Celestica Athena Erp lot9 EcoDesign. Celestica Athena Erp lot9 EcoDesign 16 pages.
Trusted Platform Module (TPM) card
Type and number of fastenings:
Tools required: None.
Procedure: Pull the TPM card out of the slot.
14