Dynapac CA 152 Workshop Manual - Page 5
Browse online or download pdf Workshop Manual for Construction Equipment Dynapac CA 152. Dynapac CA 152 11 pages. Converting drum std/d to p/pd
FITTING
Before modifying
2
1
Fig. 1 Fitting the pad half
1. Transverse beam
2. Pad half
Fig. 2 Drilling through holes
CA 150/152 W1080EN1
Fitting must be done in a workshop environment, on a
clean, level base and with lifting capabilities for at least
500 kg (1,100 lbs). Ensure at least 3 meters (120") of
free space in front of the machine (see overleaf).
Make sure the drum is well cleaned.
Estimated time for this retrofitting is about 6 hours.
The following tools are required:
- Lift, at least 500 kg (1,100 lbs)
- Screw clamps
- Drilling machine
- Drill, 18 mm (3/4")
- Hexagonal socket wrench 38 55 04
- Torque wrench
- Socket wrenches
Dismantle the front transverse beam (1).
Lift the first pad half (2) and place it on top of the drum.
Align the pad half with the outer edges of the drum. Fix
the pad half with screw clamps against the drum shell.
Keep well clear of the hoisted object.
Ensure that hoisting hooks are securely
anchored.
Drill two 18 mm (3/4") holes through the pad shell and
the drum shell. Use the two 8 mm pre-drilled holes as
position guides.
3