Dynapac CA 250 Workshop Manual - Page 6
Browse online or download pdf Workshop Manual for Utility Vehicle Dynapac CA 250. Dynapac CA 250 11 pages. Vibratory roller
Also for Dynapac CA 250: Workshop Manual (20 pages)
FITTING
Fig. 3 Fitted M20 bolts
Fig. 4 Drum
Fig. 5 Fitting the second pad half
4
4. Fit the two M20 bolts
(items 4, 5 and 6 in drawing 38 22 20).
5. Run the roller slowly forward until the drum is lo-
cated with the first fitted drum shell at the bottom.
It may help to place a 25 mm (1") thick plank where
the edge of the first pad will be.
The space required for this operation is 3 meters
(120"). The pad half nearest to the platform/cab
must be about 100 mm (4") to the upper edge of the
drum frame.
100 mm
(4")
6. Lift the second pad half in place and align it against
the outer edges of the drum.
Make sure that no one is inside the work-
ing range of the machine when you drive it
forward.
Keep well clear of the hoisted object. En-
sure that hoisting hooks are securely
anchored.
CA 250/252/262 W1065EN2